Infrastructure assessment & advisory

Know what your infrastructure can handle.

Plan your next maintenance window, hardware refresh, or VMware cloud move with a clear view of capacity, performance, and cost.

Request a time through the Opslogix contact form. It opens in a new tab.

Cluster capacity checkVMware

Can your cluster lose a host?

Try the sample or enter your own numbers. Use usable capacity after subtracting host overhead.

RAM margin after one host loss128 GiB

640 GiB demand against 768 GiB of remaining RAM.

Calculator inputs stay in your browser. View all capacity scenarios

Capacity scenarios

See what changes when a host goes offline.

Compare demand with usable capacity during normal operation, a host outage, or an outage during maintenance.

Operating scenarioUsable RAMRAM marginLimiting resource

Margins apply your utilization target to remaining capacity. The outage rows show the worst case for each resource, which can come from different hosts. This aggregate model does not check VM placement, storage, or restart eligibility.

Configure mixed hosts, CPU, and utilization

For CPU, enter usable and peak demand in the same units. GHz is a rough capacity proxy across unlike processor generations.

Compare a proposed change

Compare today’s configuration with a change under the same growth assumption. Choose the outage the proposed configuration needs to handle.

ConfigurationRAM margin

Assessment services

Get evidence for your next infrastructure decision.

Performance assessment

Review historical CPU, memory, and storage metrics to identify bottlenecks and understand which workloads are driving contention.

Capacity & resilience

Model a host outage or maintenance window. Compare the effect of adding memory, expanding the cluster, or moving workloads.

VMware cloud placement

Compare staying on-prem, moving selected workloads, or moving the entire cluster to a VMware-based private cloud. See monthly estimates and one-time migration costs.

Workload placement

Should you stay on-prem or move to VMware cloud?

Start with the workload. Identify where its users and data are, how much downtime it can tolerate, and who will operate it after the move.

Keep it on-prem

Consider staying when workloads need low-latency access to local systems, you have usable capacity, and your team can cover maintenance and recovery. Include the next hardware refresh and verify the cluster can still carry demand during a host outage.

Move to VMware private cloud

Consider moving when a refresh or site exit is approaching, or you want a provider to take on infrastructure operations. Verify what the provider manages, where data and backups reside, and what connectivity, recovery, and support the quote includes.

Move selected workloads

Group applications with their databases and shared services. Start with a group that can move together. Check the cost of running both environments and whether the move frees enough on-prem capacity to retire a host or defer a purchase.

VMware placement costs

Compare 36-month costs.

Enter your own budget or VMware private-cloud quote. Use one currency and equivalent capacity, availability, and support assumptions across all three options.

Check cluster capacity before comparing prices.

Stay on-prem
Move selected workloads
Move the full cluster

Enter 0 for a cost that does not apply. Include recurring licensing, storage, networking, backup, and support where applicable.

How it works

Start with the decision you need to make.

Define the scenario

Tell us which cluster you’re evaluating and when you need to make a decision.

Share a scoped inventory

A sanitized RVTools export supports allocation-based sizing. Optional historical telemetry helps model observed demand. Production credentials aren’t needed.

Review the options

Get a report with the modeled shortfall, options to address it, and the assumptions your team needs to verify.

Assessment workspace

Evaluate your own environment.

Create a private workspace to save assessments, check RVTools inventory, and compare VMware cloud quotes.

Create an account